男女做爰猛烈高潮描写-天堂综合网-天天天操-国产免费激情视频-亚洲激情国产-天天色天天色天天色-欧美性猛交aaaa片黑人-日韩中文字幕2019-免费在线色-中国性老太hd大全69-欧美成免费

Monitoring Warning Released by National Energy Administration Requires No New Wind Power Project Built in China’s Six Provinces and Autonomous Regions

Author: Published: 2017-02-23 Hits:

      Original link: http://www.chinapower.com.cn/focus/20170223/83359.html

  2017 wind power investment monitoring warning released by National Energy Administration today indicates that provinces (autonomous regions), such as Inner Mongolia, Heilongjiang, Jilin, Ningxia, Gansu and Xinjiang (including Xinjiang Production and Construction Corps), are red alert areas for the development and construction of wind power, while other provinces remain as green areas. According to the warning, provinces (autonomous regions) with red alert are not allowed to build new wind power project and are required to take effective measures to solve the problem of curtailment of wind power.

     It is required by National Energy Administration that grid enterprises should not accept new applications for wind power integration projects (including project under construction, approved project and project incorporated into the planning) of provinces (autonomous regions) with red alert, and government agencies should not issue power generation business licenses for new wind power projects to above-mentioned provinces (autonomous regions). Meanwhile, National Energy Administration decides to suspend the construction of wind power projects including Xinjiang Zhundong New Energy Base, Turpan One-hundred-kilometer Wind Zone and the second batch of projects of Jiuquan Wind Power Base, and use the running transmission channels or transmission channels in progress to store and transport the power of existing projects.

     As for provinces without red alert, it is necessary for them to control the pace of constructing wind power projects, independently determine the annual construction scale and list of projects based on the implementation of construction conditions like market demands, and coordinately consider the connection of construction and utilization in case of new situations required for curbing power use.

      It is reported by journalist that in order to effectively increase the clean energy supply in Beijing-Tianjin-Tangshan Region, National Energy Administration has required Hebei Provincial Energy Bureau to accelerate the construction of the second phase of wind power projects of Chengde Base to ensure that all projects can be accepted by grid by the end of 2017, and orderly promote the construction of the third phase of wind power projects of Zhangjiakou Base according to the construction schedule of Zhangjiakou Renewable Energy Demonstration Zone. Scattered wind power projects will no longer be built in Zhangjiakou and Chengde.


: : Copyright: Far East wisdom energy co., LTD : : . Green ICP prepared 05,001,602 http:// www.miitbeian.gov.cn
Friendship link
主站蜘蛛池模板: 苗栗县| 新蔡县| 定南县| 固镇县| 安多县| 轮台县| 沁源县| 太白县| 龙里县| 南江县| 咸丰县| 镶黄旗| 黎城县| 遵义县| 五大连池市| 十堰市| 全椒县| 宁阳县| 彭水| 来安县| 广饶县| 米易县| 桑日县| 临泽县| 仁布县| 黔江区| 天门市| 德清县| 吉木萨尔县| 江西省| 洛川县| 霍山县| 甘洛县| 郑州市| 尼木县| 吉首市| 崇左市| 鱼台县| 灵石县| 宁明县| 临潭县|